CC Doors Logo 1 (2)

48 West George St,

Glasgow, G2 1BP

Sectional Door Motherwell: 3-phase Power Supply

Upgrading Sectional Door Power Supply From Single-Phase To 3-Phase

Location: Eurocentral, Motherwell
Date: December 2023

We completed a small project for Gemini Accident Repair Centre at Eurocentral (Motherwell) in early December. The large sectional door is the main entrance & exit & is in constant use.

However, as it was only running on single-phase power, the decision was made to upgrade it to 3-phase power. This is far more suitable to handing the high usage of such a large door & reduces the chances of a malfunction.

As we also noticed that the centre coupling was worn, we replaced this at the same time (which prevents a costly repair if it broke in the future).

Please follow these links for more information on our work with sectional overhead doors and industrial doors.

Alternatively, click here to return to our home page.

Sectional Door - 3-Phase Power

Project Photos

Related Projects

Contact Us

For an initial discussion, or to arrange a free site survey or quotain, please get in touch:

Phone Number

Address

2nd Floor
48 West George Street
Glasgow, G2 1BP

}

Hours

Office Mon - Fri: 8am - 5pm
Available 24/7

How Can We Help?